Field Services / Virgin Islands
USD rate card2026 Q3 Caribbean pass-2 uniqueIT asset and endpoint teams rolling devices through Virgin Islands treat this page as the price spine for IMAC waves and emergency restores. Severity discipline saves money in Virgin Islands: P1/P2 → Priority/SBD, P3 overnight-ok → NBD, documented moves/adds/changes → IMAC, fluid scope → T&M. Zion scopes FTE and multi-week work in Virgin Islands after payment confirmation — list prices orient you, commercials finalize edge cases. All payable Virgin Islands SKUs use live buy.stripe.com links from the rate card; Zion never invents Payment Links on this page. Manufacturing windows in Virgin Islands may force OOH uplift (50%) even when the ticket severity looks like routine IMAC. Coverage narratives for this market emphasize island hospitality, finance, and telecom field work, which shapes how Priority versus planned IMAC is usually mixed. NOC runbooks that reference Virgin Islands should deep-link this page so agents quote current — not remembered — prices. Live anchors for Virgin Islands: Priority/SBD incident $155.79, NBD incident $146.05, 2BD IMAC incident $133.35, and a T&M day at $810.11 — all USD. Numeric snapshot for Virgin Islands: SBD $155.79, NBD $146.05, IMAC $133.35, T&M day $810.11, FTE $7,300.30; OOH 50%; weekend/holiday 100%.
NBD ($146.05 USD; add-hour $125.91 USD) is the workhorse for degradations in Virgin Islands that can close next business day without material business harm overnight.
2BD IMAC at $133.35 USD (add-hour $114.95 USD) covers installs, moves, adds, and changes in Virgin Islands when a two-business-day planning window is acceptable.
Embedded engineers for Virgin Islands are an FTE decision ($7,300.30 / $7,139.70 USD), not a taller pile of NBD incidents.
Same-business-day Priority sits at $155.79 USD for Virgin Islands. Treat it as an exception path, not the default break/fix button.
Audits, migrations, and discovery spikes in Virgin Islands burn cleanly against Time & Materials from $155.79 USD/hour upward.
Inside the Caribbean cluster, Virgin Islands still needs this local decision logic — cluster peers can differ on both price and uplift.
Published Virgin Islands amounts assume standard local business hours. Evening cutovers invoke 50% OOH; Saturday/Sunday or holiday windows add 100%.
Hybrid and distributed workplaces in Virgin Islands still need clear dockets: Zion will not invent access paths after the engineer is already traveling.
USD Payment Links keep Virgin Islands on the same ledger as sibling Caribbean pages while preserving country-specific uplift percentages.
Stakeholders new to Zion’s Caribbean catalog can use these definitions when briefing Virgin Islands approvals.
Priority / same-business-day incident — transport + first hour onsite
Pay $155.79 USDFull-time equivalent monthly rate with backfill
Pay $7,300.30 USDFull-time equivalent monthly rate without backfill
Pay $7,139.70 USDExpect closure notes that reference the SLA purchased, hours consumed, and whether 50% or 100% uplifts applied. Attach photos or serials when IMAC changes assets in Virgin Islands.
Hand residual monitoring back to the NOC with links to this rate card if recurrence would warrant another onsite buy.
1) Match severity to SLA — do not buy Priority for a cable re-run that is really 2BD IMAC. 2) Pre-stage credentials and dockets so onsite time is productive from the first hour. 3) If you expect more than ~10 consecutive days onsite, compare T&M monthly ($8,165.89 USD) against FTE with backfill ($7,300.30 USD). 4) Log OOH needs at request time so the 50% / 100% uplifts are expected, not surprising.
Zion’s Virgin Islands field services are designed for organizations that already run structured ITIL-style queues and want published rates instead of opaque day rates. Return to the Field Services hub to compare neighboring countries in the same Caribbean cluster.
SKU checkout is ideal when Virgin Islands demand is bursty. If demand stabilizes, pivot toward monthly T&M ($8,165.89 USD) or FTE ($7,300.30 USD with backfill).
Discovery $99 sits upstream for ambiguous problems; Plans and Enterprise sit downstream for retainers that may bundle Virgin Islands with peer markets.
Contact commercial when SOW-based work refuses a single SKU shape.
For Virgin Islands, after-hours (OOH) work carries a 50% uplift on top of the base SKU. Weekends and public holidays carry a 100% uplift. Both are confirmed before dispatch — they are not separate Stripe products.
An NBD (next-business-day) incident in Virgin Islands is $146.05 USD and includes transport plus the first hour onsite. Additional NBD hours are $125.91 USD.
Yes. T&M daily in Virgin Islands is $810.11 USD. Weekly ($2,916.39 USD) and monthly ($8,165.89 USD) blocks are listed for longer surges.
Yes. Weekend and holiday windows in Virgin Islands apply a 100% uplift, while non-weekend evenings use the 50% OOH uplift instead. Stacking rules are confirmed commercially at booking.
Start from the base SKU (Priority, NBD, IMAC, or T&M), then apply the Virgin Islands OOH uplift of 50% if the window is outside business hours, or 100% if it falls on a weekend/holiday.
Use this page for Virgin Islands-attributable SKUs, then review Plans or Enterprise when Virgin Islands is one node among several. The Field Services hub links every country card.
Not sure which Virgin Islands SKU fits? Start with a scoped Discovery.
Pay Discovery $99 Talk to commercialAlso see: Field Services hub · Discovery · Plans · Enterprise